top of page

DIVISION

BELL

LOCATION

Richmond, VA

PROJECT TYPE

Healthcare

PROJECT DETAILS

Hourigan Construction; Bell was the Mechanical and Plumbing Design-Assist subcontractor on this $320 million UVA Hospital Expansion Project for a new 460,000+ SF 13-story tower. The project included a new emergency department, 16 Operating and Interventional Procedure Rooms, support departments, and six (6) floors of Intensive Care and Acute Care patient units.

Bell was awarded the Mechanical and Plumbing Design-Assist subcontract on VCU’s new 18-story, 604,000 SF Adult Outpatient Pavilion and connected 475,000 SF parking deck. The effort entailed design development and construction of the facility’s mechanical and plumbing systems. Owner goals included flexible MEP systems that can support future expansions and relocations without disruption to adjacent areas. The project was required to achieve LEED Silver certification.

During the Design-Assist phase, Bell provided budgeting at the 100% Schematic Design, 100% Preliminary Design, 50% and 95% Construction Document Levels including: Budget Management (Scope Growth Control, Value Management Recommendations and Pricing); Constructability Reviews; Specification Change Recommendations; and Collaborative BIM reviews with model improvements.

Mechanical and Plumbing Systems included:

Fan Wall Air Handling Units (500,000+ cfm)
General, Special Waste, and Isolation Exhaust systems
Parking Garage Air Quality Monitoring and Ventilation
Chilled Water Plant (2,600 ton)
Steam to Heating Hot Water
Distributed Unitary Heating and Cooling Units
Emergency Generator Fuel Oil System
Domestic and Sanitary Systems and Fixtures
Clear Condensate Collection system
Medical Gas Equipment and system
Photos: VCU University Marketing

VCU: ADULT OUTPATIENT PAVILION

HB MECHANICAL GROUP
 

EAST COAST OFFICE

4660 Trindle Rd., Ste 301

Camp Hill, PA 17011 
 

WEST COAST OFFICE
33 S. 56th St.,

Chandler, AZ 85226
 

717.214.3183

© 2025 HB Mechanical Group

footer-white-stripe.png
bottom of page